
Marine systems
Fire protection for the engine room
Completed projectThe project
Fire protection project for an engine room, designed in accordance with NFPA 301, 302 and 303, the standards governing marine systems.
We carried out the engineering, supply and installation, along with the follow-up maintenance plan that keeps the system available.
Solutions delivered
- Engineering and design
- Supply and installation
- Maintenance
Project gallery
See the work carried out at every stage.
Have a project in mind?
Tell us what you need and an advisor will guide you from the initial survey through to commissioning.